Calendriers des observations

2020

Semestre : 2020A

Demandes de temps et retour du TAC :

PI Programme Temps A alloué Temps B alloué Temps C alloué Titre
Bonifacio L1201N01 1 6 6 Measuring Intermediate metallicity Neutron Capture Elements
Francois L201N02 13 13 22 Chemical characterization of high velocity stars discovered in the Gaia DR2 catalogue
Casamiquela L201N03 11 11 33 EvOC-Gaia: Chemical properties of poorly studied nearby Open Clusters
Bonifacio L201N04 1 2 21 Asteroseismology of the actinide boost star 2MASS J0954+5246
Lèbre L201N05 40 60 118.5 Spectropolarimetric monitoring of cool evolved stars : surface magnetism and photospheric diagnosis
Petit L201N06 25 25 70 BCool monitoring program: magnetic cycles of solar-type stars
Neiner L201N07 5 3 5.5 The Emergence of Magnetic Cycles in Young Suns
Richard L201N08 0 3 2 Vertical Stratification of Element Abundances in Chemically Peculiar stars
Folsom L201N09 11 10 21 Evolving Magnetic Lives of Young Suns: V
Lopez L201N10 50 35 22.5 Suivi spectroscopique et spectropolarimétrique d’étoiles actives dans le champ continu TESS : préparer les futures détections d’exoplanètes (acte III)
Alecian L201N11 45 30 29 Characterising sporadic accretion events in young stars. A spectropolarimetric TESS follow-up survey of UXORs
TOTAL 188 179 322.5

  • Temps demandé: 770h
  • Temps disponible statistique: 350h (science+readout+overhead)
  • pression 2.2

2019

Semestre : 2019B

Demandes et retour du TAC :

PI Programme Temps A alloué Temps B alloué Temps C alloué
Matas Pinto L192N01 15 15 0
Lèbre L192N02 55 55 0
Neiner L192N03 17.8 8.9 0
Bonifacio L192N04 5 5 0
Petit L192N05 98 49 0
Alecian L192N06 105 0 0
Langlois L192N07 6.7 0 1.7
Brun L192N08 29.33 14.67 0
TOTAL 331.8 147.6 1.7

Total alloué       481.1h

Semestre : 2019A

Bilan :

  • Temps demandé: 739h
  • Temps alloué : 635 h (300 h en A)

Semestre : 2018B

Tutelles du porteur de projet Temps attribué Temps observé
CNRS / Université de Grenoble 25h (A), 35h (B) 23,5h (A)
CNRS / Université de Bordeaux 15h (A), 10h (B) 11,5h (A), 9,5h (C)
CNRS / Université Toulouse III 30h (A), 14h (B) 34,5h (A), 12,5h (B)
CNRS / Université Toulouse III 21h (A), 20h (B), 15h (C) 21h (A), 10h (B)
CNRS / Université Montpellier 100h (A), 59h (B) 35,5h (A), 48h (B)
CNRS / Université Toulouse III 25h (A), 15h (B) 7,5h (A), 6h (B)
CNRS / Obs. de Paris / Univ. Paris 15h (A), 11h (B) 11h (A), 11h (B)
CNRS / Université Montpellier 5h (A) 4,5h (A)
CNRS / Université Toulouse III 80h (A), 70h (B), 20h (C) 29h (A), 21h (B)

Bilan :

  • Temps alloué : 585 h (316 h en A)
  • Temps observé : 296 h + 3 h (temps technique) = 299 h (188 h en A)

2018

Semestre : 2018A

Tutelles du porteur de projet Temps attribué Temps observé
CNRS / Université Toulouse III 46h (A), 40h (B), 10h (C) 12h (A), 14h (B)
CNRS / Obs. de Paris / Univ. Paris 20h (A), 4h (B) 10h (A), 3h (B)
CNRS / Obs. de Paris / Univ. Paris 12h (A), 12h (B) 7,5h (A), 6,5h (B)
CNRS / Université Montpellier 70h (A), 30h (B) 40h (A), 0,5h (B)
CNRS / Obs. de Paris / Univ. Paris 37,24h (A), 21,33h (B) 19h (A) + 9,5h (B)
CNRS / Université Toulouse III 48h (A) 8,5h (A)/td>
CNRS / Université Toulouse III 20h (B) 13,5h (B)
CNRS / Obs. de Paris / Univ. Paris 13,33 h (A) 26h (A), 0.5h (C)
CNRS / Université Toulouse III 30h (A) 16h (A)
CNRS / Université Toulouse III 30h (A), 10h (B) 18,5h (A), 4h (B)
CNRS / Obs. de Paris / Univ. Paris Temps discrétionnaire 1,5h
OPTICON 14h (A) 14h (A)

Bilan :

  • Temps alloué : 453,9 h (306,57 h)
  • Temps observé : 214,5 h+ 3,5 h (temps technique) = 218 h (175,5h en A)

Semestre : 2018B

Tutelles du porteur de projet Temps attribué Temps observé
CNRS / Université de Grenoble 25h (A), 35h (B) 23,5h (A)
CNRS / Université de Bordeaux 15h (A), 10h (B) 11,5h (A), 9,5h (C)
CNRS / Université Toulouse III 30h (A), 14h (B) 34,5h (A), 12,5h (B)
CNRS / Université Toulouse III 21h (A), 20h (B), 15h (C) 21h (A), 10h (B)
CNRS / Université Montpellier 100h (A), 59h (B) 35,5h (A), 48h (B)
CNRS / Université Toulouse III 25h (A), 15h (B) 7,5h (A), 6h (B)
CNRS / Obs. de Paris / Univ. Paris 15h (A), 11h (B) 11h (A), 11h (B)
CNRS / Université Montpellier 5h (A) 4,5h (A)
CNRS / Université Toulouse III 80h (A), 70h (B), 20h (C) 29h (A), 21h (B)

Bilan :

  • Temps alloué : 585 h (316 h en A)
  • Temps observé : 296 h + 3 h (temps technique) = 299 h (188 h en A)

2017

Semestre : 2017A

Tutelles du porteur de projet Temps attribué Temps observé
CNRS / Obs. de Paris / Univ. Paris 9h (A), 7,5h (B) 9h (A),12h (B)
CNRS / Obs. de Paris / Univ. Paris 7h (A), 7h (B) 7h (A), 7h (B)
CNRS / Université Toulouse III 46h (A), 40h (B,) 10h (C) 30,5 h (A), 28,5h (B)
CNRS / Université Montpellier 25,6h (A) et 5,5h (B) 24h (A),11,5h (B)
CNRS / Obs. de Paris / Univ. Paris 12,4h (A), 7,2h (B), 28,6h (C) 12h (A), 16h (B), 78h (C)
CNRS / Université Toulouse III 30,6h (A) 16h (A)
CNRS / Université Toulouse III 8h (A), 24h (B) 20,25h (A), 21,25h (B)
OPTICON 15,5h (A) 15,5h (A)

Bilan :

  • Temps alloué : 268,4 h (138,6h en A)
  • Temps observé : 324 h + 8 h (temps technique) = 332 h (150 h en A)

Semestre : 2017B

Tutelles du porteur de projet Temps attribué Temps observé
CNRS / Obs. de Paris / Univ. Paris 13h (A), 10h (B) 0h
CNRS / Université Aix-Marseille 67h (A), 10h (B) 23h (A)
CNRS / Université Toulouse III 40h (A), 30h (B), 20h (C) 28h (A), 19h (B), 7,5h (C)
CNRS / Obs. de Paris / Univ. Paris 1h (A) 1h (A)
CNRS / Obs. de Paris / Univ. Paris 10h (A), 10h (B) 23,5h (A), 7h (B)
CNRS / Université Toulouse III 21h (A), 14h (B) 15h (A)
CNRS / Université Toulouse III 32h (A) 8h (A)
CNRS / Obs. de Paris / Univ. Paris 46,8h (A), 17,1h (B), 36h (C) 11,5h (A), 9h (B), 22,5h (C)
CNRS / Université Montpellier 50 h (A), 20,5h (B) 18h (A), 6h (B)
CNRS / Université Toulouse III 35h en A, 12h en B 33,5h (A), 7h (B)
CNRS / Université Toulouse III 80h (A), 70h (B), 20h (C) 35h (A), 44h (B)

Bilan :

  • Temps alloué : 665,4h (395,8h en A)
  • Temps observé : 318,5 h + 8,5 h (temps technique) = 327 h (196,5 h en A)

2016

Calendrier : 2016 B

Le TBL a reçu 4 demandes OPTICON pour 78h claires demandées (66h shutter open). Sur l’appel d’offre INSU, 5 demandes (4 PNPS, 1 PCMI) ont été faites pour 192h claires (124 shutter open). Le total d’heures PI en 2016B est donc 270h. Les dernières statistiques des semestres B ( Statistiques), font état de 343h shutter open observées en moyenne. 514h claires ont été demandées en 2016B par les programmes larges, ce qui donne un total PI+LP = 638h, c’est-à-dire une pression de 1.9.

Le Comité d’allocation national a préalloué aux programmes larges 135h (+ 20h en C), ce qui laisse 208h aux programmes PI français et OPTICON. Le TAC OPTICON se réunit le 3 mai 2017. Le TAC national le 12 mai 2016.

Le calendrier est le suivant:

 Date    Mission Type
Science observations Service
Technique
Fermé
Science observations
Technique
Science observations
Technique

 

Retour sur les allocations 2016B

Les allocations de temps du TAC National pour le semestre 2016B sont données ci-dessous:

programme Type PI A B C
L162N01 PNPS BLAZERES 4 1
L162N02 PNPS CARMONA 26 1
L162N04 PCMI LALLEMENT 20 1
L162N06 PNPS NEINER_007 16 16 1
L162N07 PNPS NEINER_008 7,5 1
L162N09 D JEFFERS 12 1

En ce qui concerne les programmes larges, le TAC a réalloué le temps du semestre 2016B comme suit:

programme Type PI 2016B

A|B|C

L162N03 LP-PNPS DONATI 39|16|30
L162N05 LP-PNPS LEBRE 15|15|30
L162N08 LP-PNPS PETIT 30|20|30

Calendrier : 2016 A

Le TBL a reçu 3 demandes OPTICON (35h). Sur l’appel d’offre INSU, 8 demandes (7 PNPS, 1 PNP) ont été faites dont 3 demandes sont en LP depuis 2014A pour un total de 140h pré-allouées en LP (sur 535h originellement demandées en 2016A)  et 187h demandées en programme PI (tous les temps sont donnés en stricte intégration sur le ciel excluant les temps de lectures, pointage, etc.)
Sur un semestre A on peut attendre ~250h (shutter open) observées (pour 240 nuits programmées). La pression des programmes PI seuls est donc de 187/(250-140) = 1.7.

Le Calendrier sera affiché ci-dessous:

 Date    Mission Type
March 1st-20 Science observations
March 21-April 3rd Technical Primary mirror realuminization
April 4-24 Science observations
April 25-May 1st Technical TCS
May 2-25 Science observations
May 26-29 Technical Cryostat vacuum pumping
May 30-June 22 Science observations
June 23-26 Technical Cryostat vacuum pumping
June 27-July 27 Science observations
July 28-31st Technical Cryostat vacuum pumping
August 1-24 Science observations
August 25-28 Technical Cryostat vacuum pumping
August 29-31st Science observations

Répartition des demandes en ascensions droites des demandes 2016A

RA 2016A

Retour sur les demandes de temps 2016A

Les allocations de temps du TAC National pour le semestre 2016A seront données ci-dessous:

programme Type PI A B C
L161N02 PNPS NEINER 7 13 1
L161N04 PNP HEBRARD 24 0 1
L161N05 PNPS FOLSOM 16 0 1
L161N06 OPTICON JEFFERS 12(+16.5) 12 1
L161N08 PNPS BLAZERES 13 0 1

En ce qui concerne les programmes larges, le TAC a réalloué le temps du semestre 2016A comme suit:

programme Type PI 2016A

A|B|C

2016B

A|B|C

L161N07 LP-PNPS DONATI 39|20|1 39|16|1
L161N03 LP-PNPS LEBRE 20|45|1 15|15|5.4
L161N01 LP-PNPS PETIT 30|46|1 30|20|15

2015

Calendrier : 2015 B

Le TBL a reçu 5 demandes OPTICON pour 120h claires. Sur l’appel d’offre INSU, 9 demandes (6 PNPS, 2 PNP, 1 PCMI) ont été faites pour 368h claires. Le total d’heures PI en 2015B est donc 488h. Sur les 6 derniers semestres B, ont été validés en moyenne 291h. 560h claires ont été demandées en 2015B par les programmes larges, ce qui donne un total PI+LP = 1048h, c’est-à-dire une pression de 3.6.

Le Comité d’allocation national a préalloué aux programmes larges 133h (+ 20h en C), ce qui laisse 167h aux programmes PI français et OPTICON. Le TAC OPTICON réuni le 21 avril 2015 n’a pas accordé de temps aux programmes TBL, Il reste donc la totalité des 167h à distribuer. Le TAC national le 18 mai 2015.

Le calendrier est le suivant:

 Date    Mission Type
Sept 1-20 Science observations Service
Sept 21-24 Technique Pilotage- Peinture
Sept 25-27 Fermé
Sept 28- Nov 4 Science observations Service (téléphérique fermé Nov 2->)
Nov 5-8 Technique Pilotage IHM (téléphérique fermé)
Nov 9-25 Science observations Service (téléphérique fermé)
Nov 26-29 Technique Pilotage (téléphérique fermé)
Nov 30-Dec 20 Science observations Service + visiteur (téléphérique fermé -> dec 6)
Dec 21-Jan 6 Fermé
Jan 8-31 Science observartions Service
Fev 1-4 Technique Pilotage
Fev 8-25 Science observartions Service
Fev 26-29 Fermé
distribution RA 2015B

Distribution des étoiles en ascension droite

Retour sur les demandes de temps 2015B

programme Type PI A B C
L152N01 PNPS BLAZERE 13 15 1
L152N02 PNPS BUYSSCHAERT 10 10 1
L152N03 PNPS FOLSOM_007 0 8 1
L152N04 LP-PNPS DONATI 39 14 1
L152N05 PNPS FOLSOM_009 4 3 1
L152N06 LP-PNPS LEBRE 15 15 5.4
L152N07 PCMI LALLEMENT 15 10 1
L152N08 PNP LASUE 3 (14) 1
L152N09 PNPS NEINER 7 12 7
L152N10 LP-PNPS PETIT 30 20 15
L152N11 PNP MOUTOU 5(10) 0 1
L152N12 PNPS OKSALA 32 0 1

L’allocation entre () est conditionnelle

 

Calendrier : 2015 A

Le TBL a reçu 2 demandes OPTICON (56h), dont une a obtenue 32h au TAC OPTICON. Sur l’appel d’offre INSU, 9 demandes (8 PNPS, 1 PNP) ont été faites dont 6 demandes en LP pour un total de 585h a u total en 2015A (tous les temps sont donnés en stricte intégration sur le ciel excluant les temps de lectures, pointage, etc.) et 560h en 2015B, 535h en 2016B, 514h en 2016B.
Sur un semestre A on peut attendre ~250h (shutter open) observées (pour 240 nuits programmées). La pression est donc de 2,6.

Le TAC national s’est réuni le 14 janvier 2015 pour sélectionner les programmes.

Le Calendrier est le suivant:

 Date    Mission Type
1-18 mars Science Observations Service mode
19-25 mars Fermé
26 mars-1avril Science Observations Service mode
2-5 avril Fermé
6-9 avril Technique Jouvence pilotage
10-12 avril Fermé
13 avril-3 mai Science Observations Service mode
4-7 mai Technique Jouvence pilotage
8-10 mai Fermé
11 mai-17 juin Science Observations Service mode
18-21 juin Fermé
22 juin-1 juillet Science Observations Service mode
2-5 juillet Fermé
6-22 juillet Science Observations Service mode
23 juillet-2 août Fermé
3-12 août Science Observations Service mode
14-16 août Fermé
17-28 août Science Observations Service mode
29-31 août Fermé

Répartition des demandes en ascensions droites  des demandes 2015A

2015A.jpg

Retour sur les demandes de temps 2015A

Les allocations de temps du TAC National pour le semestre 2015A sont:

programme Type PI A B C
L151N01 PNPS BLAZERE 10.5 0 1
L151N02 OPTICON BORISOVA 16 16 1
L151N03 PNP BOURRIER 18 10 1
L151N04 LP-PNPS DONATI 22.2 0 1
L151N05 PNPS FOLSOM 6.25 0 1
L151N06 LP-PNPS LEBRE 20 25.2 4
L151N07 PNPS LIGNIERES 2.2 13.3 1
L151N08 PNPS MORIN 10 8 1
L151N09 PNPS NEINER 0 10 40
L151N10 LP-PNPS PETIT 30 26 10
L151N11 PCMI LALLEMENT 4 4 1

En ce qui concerne les programmes larges, le TAC a également préalloué le temps des quatre semestres à venir:

programme Type PI 2015A

A|B|C

2015B

A|B|C

2016A

A|B|C

2016B

A|B|C

L151N04 LP-PNPS DONATI 22.2|0|1 39|14|1 39|0|1 39|16|1
L151N06 LP-PNPS LEBRE 20|25.2|4 15|15|5.4 20|25.2|4 15|15|5.4
L151N10 LP-PNPS PETIT 30|26|10 30|20|15 30|26|10 30|20|15

2014-2007

Calendrier : 2014 B

Le TBL a reçu 320h de demandes PI de temps clair, reparties en 8h PCMI, 96h PNP, 224h PNPS. 24h sont allouées à OPTICON en 2014B et 221h sont pré-allouées aux programmes larges. Pour 400h-450h (shutter open+readout) claire en moyenne, cela donne une pression de ~2.

 

 Date    Mission Type
Septembre 1-28 Science Observation Service mode
Sept 29- Oct 3 Technique Pilotage TCS
Octobre 4-5 Fermé pompage cryostat
Oct 6- Nov 5 Science Observation Service mode
Novembre 6-9 Fermé pompage cryostat
Nov 10-Déc 7 Science Observation Service mode
Décembre 8-12 Technique Pilotage TCS
Décembre 13-14 Fermé pompage cryostat
Décembre 15-23 Science Observation Service mode
Déc 24-Jan 4 Fermé pompage cryostat
Janv 5-Fév 1er Science Observation Service mode
Février 2-6 Technique Plancher coupole
Février 7-8 Fermé
Février 9-12 Technique Pilotage TCS
Février 13-28 Fermé

Programmes alloués:

PNP: valeur entre () = fraction des heures allouées sous réserve de financement par PI étrangers

rang programme Type PI A B C
1 L142N01 LP-PNPS Petit 25 25 1
1 L142N02 LP-PNPS Neiner 17 17 1
1 L142N03 LP-PNPS Lignières 15 18 1
1 L142N04 LP-PNPS Donati 52 52 1
1 L142N05 OPTICON Jeffers 12 12 1
2 L142N06 PNP Welsh 16 (8) 16 (8) 1
2 L142N07 PNPS Neiner 8 20 1
2 L142N08 PNP Lilensten (visiteur) 8 0 0
2 L142N09 PNPS Lignières 16 8 1
2 L142N10 PNPS Lèbre 0 0 16
2 L142N11 PCMI Lallement 4 4 1
2 L142N12 PNPS Folsom005 24 8 1
2 L142N13 PNPS Folsom007 0 0 16
2 L142N14 PNP Bourrier 12 (8) 12 (8) 1
2 L142N15 PNPS Aurière 16 0 1
2 L142N16 PNPS Alecian 8 0 8
TOTAL 233 (16) 192 (16)

 

Calendrier : 2014 A

Le TBL a reçu 4 demandes OPTICON (84h), mais aucune n’a passé le TAC OPTICON, les nuits bulgares sont finies. Restent 6 demandes PI (240h) dont deux à cheval entre PNPS et PNP, Boissé et Hébrard, pour un total FR+OPTICON de 324 heures demandées.
Sur un semestre A on peut attendre ~300h (shutter open+readout) observées. ~150h sont réservées aux programmes larges, il en reste ~150h. Donc une pression de 2.2 au total, donc 1.6 par PI FR.

Le Calendrier est le suivant:

 Date    Mission Type
Mar. 01 – 23 Technique Aluminure M2
Mar. 24 – Avr. 20 Science Observations Service mode
Avr. 21 – 27 Technique Jouvence pilotage
Avr. 28 – Mai 18 Science Observations Service mode
Mai 19 – Juin 1 Fermé
Juin 2 – 29 Science Observations Service mode
Juin 30 – Juil. 6 Technique Jouvence pilotage
Juil. 7 – 27 Science Observations Service mode
Juil. 28 – Aout 6 Fermé
Aout 7-31 Science Observations

Répartition des demandes en ascensions droites  des demandes:

2014A-RA

 

Retour sur les demandes de temps 2014A

Les allocations de temps CS2M pour le semestre 2014A sont:

rang programme Type PI A B C
1 L141N01 LP-PNPS Petit 25 35 1
1 L141N02 LP-PNPS Neiner 10 20 1
1 L141N03 LP-PNPS Lignières 15 18 1
1 L141N04 LP-PNPS Donati 16 0 1
2 L141N05 PNP/PNPS Boisse 0 32 1
2 L141N06 PNPS Folsom 33 0 1
2 L141N07 PNPS Aurière 24 0 1
2 L141N08 PNPS Neiner 16 32 1
2 L141N09 PNP/PNPS Hébrard 0 20 1
2 L141N10 BLGR Borissova 4 0 1

Calendrier: 2013 B

Le TBL a reçu 7 demandes PI pour 165h, 4 demandes OPTICON pour 136h, Les 3 programmes larges pour 434h. le total demandé est donc de 735h. Le nombre d’heures claires observées par semestre s’élève statistiquement à ~350-400h, la pression est donc environ 2.

Le CSM2 a pré-alloué 221h au programmes larges sur les semestres B, OPTICON a accordé 8h d’observation à un programme, le Bulgarie a 16h de télescope alloué en 2013B. 245h de télescope sont donc réservé, il reste donc à distribuer entre 105 et 155h aux programmes PI.

 Date    Mission Type
Septembre 1 Fermé pompage cryostat
Septembre 2-25 Science Observation Service mode
Septembre 26-29 Fermé pompage cryostat
Septembre 30-Octobre 2 Technique Hydraulique
Octobre 3-20 Science Observation Service mode
Octobre 21-27 Fermé pompage cryostat
Octobre 28-30 Technique Pilotage
Octobre 31-Novembre 27 Science Observation Service mode
Novembre 28-Décembre 1 Fermé pompage cryostat
Décembre 2-22 Science Observation Service mode
Décembre 23-Janvier 1 Fermé pompage cryostat
Janvier 2-31 Science Observation Service mode
Février 1-2 Fermé pompage cryostat
Février 3-8 Technique Thermique
Février 9 Fermé pompage cryostat
Février 10-13 Science Observation Service mode
Février 14-28 Fermé

Programmes Observés

rang programme type PI titre A B C
1 L132N01 PNPS Petit Dynamic Proc. in solar-type stars 25 25 1
1 L132N02 PNPS Neiner Binamics 17 17 1
1 L132N03 PNPS Lignières A-type stars 15 18 1
1 L132N04 PNPS Donati MaTYSSE 52 52 1
1 L132N05 BLG Borisova Magnetic giants + … 16 0 1
2 L132N06 OPTICON Kriskovics Li 6708 EW in V1358 Ori 8 0 1
2 L132N07 PNPS Aurière Magnetic Giant stars 9 0 1
2 L132N08 PNP Bourrier Hot Jupiter HD189733b 6 6 1
2 L132N09 PNPS Hébrard Jitter in RV curves 52 0 23
2 L132N10 PNP Welsh Exocomets around A stars 6 6 1
2 L132N11 PNPS Bouvier preparation for HMS 12 0 1
2 L132N12 PNPS Lèbre Magnetism in Mira stars 0 15 15

Calendrier : 2013 A

 Date    Mission Type
Mar. 01 – 06 Fermé
Mar. 07 – 08 Technique Jouvence pilotage
Mar. 09 – 17 Fermé
Mar. 18 – 27 Science Observations Service mode
Mar. 28 – 31 Fermé
Apr. 01 – 14 Technique Aluminure
Apr. 15 – May 15 Science Observations Service mode
May 16 – 19 Fermé
May 20 – Jun. 19 Science Observations Service mode
Jun. 20 – 27 Technique Mise en place Pilotage
Jun. 28 – Jul. 14 Science Observations Service mode
Jul. 14 – 31 Fermé
Aug. 01 – 28 Science Observations Service mode
Aug. 29 – 31 Fermé

Retour sur les demandes de temps 2013A

Les allocations de temps CS2M pour le semestre 2013A sont les suivantes :

Le TBL a reçu 14 demandes pour un total de 106 nuits claires. Le nombre total d’heures claires statistiquement observées en semestre A est de 350-400 h (43-50 nuits de 8h). La pression est donc entre 1.8 et 2.5.

Programmes semestriels :

rang programme Type PI titre A B C
1 L131N01 Large FR PETIT B Cool Large program 25 35 1
1 L131N02 Large FR NEINER BinaMIcS Large program 10 20 1
1 L131N03 Large FR LIGNIERES Vega-like magnetism 15 18 1
1 L131N04 Large FR DONATI MATYSSE 24 1 1
1 L121N05 PI BLG BORISSOVA Magnetism of Red Giants 15 1 1
2 L121N06 PI FR ALECIAN Fossil magnetism in hot stars 32 1 1
2 L121N07 PI FR AURIERE Magentic fields in late-type Giant Stars 24 1 1
2 L121N08 PI FR BOUVIER Preparatory run for HMS 24 1 1
2 L121N09 PI FR LEBRE Magnetic Fields in Mira-type 20 38 1
2 L121N10 PI OPTICON FARES Transit of planets 10 10 1
2 L121N11 PI OPTICON SOUSA Characterization of planet-hosts 8 1 1
2 L121N12 PI PNP BOURRIER hot Jupiter around HD 189733b  10 10 1

Répartition des demandes en ascensions droites :

histogramme RA 2013A

CALENDRIER 2012 B

  Date    Mission Type
Sept 1-2 Fermé
Sept 3 Technique Cleaning of Narval
Sept 4-21 Science Observations Service mode
Sept 20-21 Technique partielle jouvence pilotage
Sept 22-23 Fermé
Sept 24-26 Technique guiding camera upgrade
Sept 27-30 Fermé
Oct 1-Oct 17 Science Observations Service mode
Oct 4-5 Technique partielle jouvence pilotage
Oct 18-21 Fermé
Oct 22-Nov 14 Science Observations Service mode
Oct 25-26 Technique partielle jouvence pilotage
Nov 15-18 Fermé
Nov 19-Dev 22 Science Observations Service mode
Dec 23-Jan 2 Fermé
Jan 3-9 Technique pilotage + thermique
Jan 10-Fev 3 Science Observations Service mode
Fev 4-10 Fermé
Fev 11-21 Technique upgrade pilotage, technique armoire

Les allocations de temps CS2M pour le semestre 2012A sont les suivantes :
Large Programmes (multi-semestriels) :

rang programme PI titre A B C
1 L121N01 DONATI MaPP – studying magnetized star/planet formation 25 25 0
2 L121N02 NEINER MiMeS – Magnetism in Massive Stars 52 52 0
3 L121N03 SOUBIRAN Ground-based observations for Gaia calibrations 16 16 0

Programmes semestriels :

rang programme PI titre A B C
4 L121N04 MILLER Measuring the spin-orbit misalignment of planets around hot stars 15 20 0
5 L121N05 LEBRE Search for Magnetic Field in Mira Stars 18 10 0
6 L121N06 PETIT Dynamo processes and magnetic cycles in solar-type stars 48 56 8
7 L121N07 MORIN Improving detection limits of planets orbiting moderately active M dwarfs with polarimetric monitoring 24 0 8
8 L121N08 AURIERE Magnetic Fields in Late-type Giant Stars 24 24 0
9 L121N09 LIGNIERES The magnetic field of theta Leo : searching for Vega-type magnetic field in Am stars 0 0 24

 

Calendrier : 2012 A

  Date    Mission Type
Mar. 01 – 28 Science Observations Service mode
Mar. 29 – Apr. 1 Fermé
Apr. 2 – 5 Technique Jouvence pilotage
Apr. 6 – 15 Fermé
Apr. 16- May 13 Science Observations Service mode
May 15 – 20 Fermé
May 21 – 24 Technique Jouvence pilotage
May 25 – 30 Fermé
May 31 – Jun. 24 Science Observations Service mode
Jun. 25 – 27 Technique Caissons
Jun. 28 – Jul. 1 Fermé
Jul. 2 – 3 Technique Hydraulique
Jul. 4 – 25 Science Observations Service mode
Jul. 26 – Aug. 05 Fermé
Aug. 06 – 25 Science Observations Service mode
Aug. 26 – 31 Fermé

 

Retour sur les demandes de temps 2012B

Les programmes sélectionnés par le CS2M sont les suivants :

Large Programmes (multi-semestriels) :

rang programme PI titre A B C
1 L121N01 DONATI MaPP – studying magnetized star/planet formation 96 96 0
2 L121N02 NEINER MiMeS – Magnetism in Massive Stars 52 52 0
3 L121N03 SOUBIRAN Ground-based observations for Gaia calibrations 16 16 0

Programmes semestriels :

rang programme PI titre A B C
4 L121N04 KRISKOVICS Measuring Li I 6708 equivalent width variations and differential rotation in the Li-rich giant DI Psc 16 0 0
5 L121N05 LEBRE Search for Magnetic Field in Mira Stars 10 17 1
6 L121N06 AURIERE Magnetic Fields in Late-type Giant Stars 24 24 0
7 L121N07 PETIT Dynamo processes and magnetic cycles in solar-type stars 56 59 45

L’appel d’offre de demandes de temps du semestre 2012B est maintenant clos.

Les programmes larges au nombre de 3 ont 240+130+40 heures claires A+B pré-allouées et un max de 20h A+B OPTICON (10h/nuits), 430h.

Par ailleurs le TBL a reçu 4 demandes PI pour un total de 350h claires sur le semestre.

Le nombres d’heures claires statistiques pour 120 nuits d’observations est de  513h (d’une aube nautique à l’autre).

La demande excède donc la capacité d’observation d’un peu moins d’un facteur 2.

Pression en ascension droite :

histogramme RA 2012B

Calendrier : 2011 B

  Date    Mission Type
Sept 01-05 Science Observations Service mode
Sept 06-14 Technique test vibration PCC
Sept 15-Oct 20 Science Observations Service mode
Oct 21-Nov 7 Technique formation
Nov 8-Dec 22 Science Observations Service mode
Dec 23-Jan 2 Fermé
Jan 3-Fev 5 Science Observations Service mode
Fev 6-28 Technique PCC remplacement

Large Programmes (multi-semestriels) :

rang programme PI titre A B C
1 L101N02 DONATI MaPP – studying magnetized star/planet formation 30 30
2 L102N02 NEINER MiMeS – Magnetism in Massive Stars 45 45
3 L102N03 SOUBIRAN Ground-based observations for Gaia calibrations 15 15

Programmes semestriels :

rang programme PI titre A B C
4 L111N04 KORHONEN Magnetic structures in the photosphere of FK Com 10 10
5 L111N05 PRZYBILLA Quantitative Spectroscopy of Galactic Supergiants 5 5
6 L111N06 BOUVIER The Magnetic Sun in Time 49
7 L111N07 AURIERE Magnetic Fields in Late-type Giant Stars 14 0 4
8 L111N08 MORGENTHALER Dynamo processes and magnetic cycles in solar-type stars 56 56 21
9 L111N09 LIGNERES Exploring Vega-like magnetism among A-type stars 21 10
10 L111N10 UYTTERHOEVEN Characterization of Kepler pulsators across the HR-diagram 0 0 14

 

Calendrier : 2011 A

  Date    Mission Type
Mar. 01 – 14 Mission technique PCC
Mar. 14 – Apr. 7 Science Observations Service mode
Apr. 8 – 20 Fermé/Technique Electronique
Apr. 21- May 18 Science Observations Service mode
May 19 – 26 Technique centrale froid
May 27 – Jun. 19 Science Observations Service mode
Jun. 20 – 29 Fermé
Jun. 30 – Jul. 24 Science Observations Service mode
Jul. 25 – Aug. 07 Fermé
Aug. 08 – 29 Science Observations Service mode
Aug. 29 – 31 Fermé

Les allocations de temps CS2M pour le semestre 2011B sont les suivantes :
Large Programmes (multi-semestriels) :

rang programme PI titre A B C
1 L112N01 DONATI MaPP – studying magnetized star/planet formation 48 48 0
2 L112N02 NEINER MiMeS – Magnetism in Massive Stars 52 52 0
3 L112N03 SOUBIRAN Ground-based observations for Gaia calibrations 16 16 0

Programmes semestriels :

rang programme PI titre A B C
4 L112N04 KONSTANTINOVA Magnetic fields in M giants : dynamo operation on the asymptotic giant branch. 24 24 0
5 L111N05 AURIERE Magnetic Fields in Late-type Giant Stars : follow up of key objects 16 8 0
6 L111N06 LIGNERES Exploring Vega-like magnetism among A-type stars 24 0 0
7 L111N07 PETIT Dynamo processes and magnetic cycles in solar-type stars 32 88 0

 

Calendrier : 2010 B

  Date    Mission Type
Mar. 01 – 04 Fermé
Mar. 05 – 31 Science Observations Service mode
Apr. 01 – 04 Technique Pompage Cryostat
Apr. 05- 25 Science Observations Service mode
Apr. 26 – 28 Technique Onduleur
Apr. 29 – May 02 Fermé
May 03 – 28 Technique Aluminure/Wallace/tests
May 29 – 30 Fermé
May 31 – Jun. 02 Technique Pompage Cryostat
Jun. 03 – 23 Science Observations Service mode
Jun. 24 – 27 Technique Pompage Cryostat
Jun. 28 – 30 Technique Electronique
Jul. 1 – 25 Science Observations Service mode
Jul. 26 – Aug. 01 Technique Pompage Cryostat
Aug. 02 – 23 Science Observations Service mode
Aug. 24 – 31 Fermé

Voici le tableau des demandes acceptées et leur allocation en temps A, B et C.

Large Programmes (multi-semestriels) :

rang programme PI titre A B C PN
1 L101N02 DONATI MaPP – studying magnetized star/planet formation 60 60 PNPS
2 L102N02 NEINER MiMeS – Magnetism in Massive Stars 65 65 PNPS
3 L102N03 SOUBIRAN Ground-based observations for Gaia calibrations 30 30 PNPS

Ces 29 nuits/semestre (pour Soubiran 4 n) sont allouées sur 4 autres semestres (->12B) a minima et sortent du pot commun, sauf indication spécifique du PN concerné.

Programmes semestriels :

rang programme PI titre A B C PN
4 L102N04 KONSTANTINOVA Magnetic Fields in Late-type Giant Stars 15 15 Autre
5 L102N05 MILLER Confirming the first transiting planets around early-type stars 15 15 OPTICON
6 L102N06 FARES Interactions Étoile-Exoplanète : … 30 30 PNP
7 L102N07 LALLEMENT Towards a 3D picture of the North Polar Spur/Loop1 10 10 PNPS
8 L102N08 AYRES The Magnetic Personalities of Hertzsprung Gap Giants 4 PNPS
9 L102N09 SKELLY Dynamo Activity on the weak line T Tauri star V410 Tau 30 30 PNPS
10 L102N10 MORGENTHALER Dynamo processes and magnetic cycles in solar-type stars 55 55 110 PNPS
11 L102N11 AURIERE Magnetic Fields in Late-type Giant Stars 30 PNPS
12 L102N12 UYTTERHOEVEN Characterization of Kepler pulsators across the HR-diagram 50 PNPS
13 L102N13 MORIN Modelling non-solar coronae using ZDI magnetograms and VLBA imaging 30 PNPS
14 L102N14 ALECIAN Magnetism and spectral variability of Herbig Ae/Be X-ray emitters 50 PNPS
15 L102N15 MARSDEN The magnetic topology of young Suns 70 PNPS

 

Calendrier : 2010 A

  Date    Mission Type
Sept. 01 – 10 Technique Groupe Froid
Sept. 11 – 30 Technique Test outils service
Oct. 1 – 8 Science Observations Service mode
Oct. 9 – 11 Technique Pompage Cryostat
Oct. 12- Nov 15 Science Observations Service mode
Nov. 16 – 22 Technique Hydraulique/Pompage Cryostat
Nov. 23 – Dec. 23 Science Observations Service mode
Dec. 24 – 30 Fermé/Technique Pompage Cryostat
Dec. 31 Science Observations/Moon Eclipse Service mode
Jan. 1 – 3 Fermé
Jan. 4 – Feb. 4 Science Observations Service mode
Feb. 5 – 7 Technique Pompage Cryostat
Feb. 8 – 18 Science Observations Service mode
Feb. 19 – 28 Fermé
Programme PI A (hr) B (hr) cumul A+B (hr) C (hr) PN
L101N01 Konstantinova 7 7 14 temps garanti
L101N02 Morgenthaler 66 66 146 PNPS
L101N03 Wszolek 4 4 154 PCMI
L101N04 Donati 20 20 194 PNP
L101N05 Soubiran 20 20 234 PNPS
L101N06 Lignière (Vega) 20 20 274 PNPS
L101N07 Aurière 14 14 302 PNPS
L101N08 Fabas 7 7 316 PNPS
L101N09 Catala (Kepler) 20 20 356 20 PNPS
L101N10 Korhonen 10 10 376 PNPS
L101N11 Neiner 13 13 401 174 PNPS
L101N12 Moutou 100 PNP
L101N13 Lignière (étoilesA) 20 PNPS
L101N14 Catala2 40 PNPS
L101N15 Alecian 20 PNPS
L101N16 Mathias 3 PNPS
L101N17 Chadid 3 PNPS

 

Calendrier : 2009 B

  Date    Mission Nom PI Titre
Mars.01-06 Tech. Pompage cryostat
Mars.07-13 L091N01/N02/N03 Alecian/Neiner/Soubiran
Mars.14-17 L091N02/N03/N04 Neiner/Soubiran/Van Grootel
Mars.18 L091N02/N03/N05 Neiner/Soubiran/Auriere
Mars.19-22 fermé
Mars.23-Avr.09 technique moteur alpha
Avr.9-10 L091N03/N05 Auriere/Soubiran
Avr.11-16 L091N02/N03/N06 Neiner/Soubiran/Catala
Avril17-19 fermé
Avril 20-21 Test service/DDT
Avril 22-30 L091N07/N08/N02 Korhonen 3h/Moutou 1h/Neiner
Mai.1-3 Fermé
Mai.4- 19 Tech. Centrale hydraulique
Mai.20-21 L091N05 Auriere
Mai.23-25 L091N09 Petit
Mai.26-31 L091N10/N08 Jeffers 4h/Moutou 3h
Juin.1-2 L091N09/N08 Petit 3.5h/ Moutou 3h
Juin.3-12 L091N09/N08/N12 Petit 3.5h/ Garcia 1h/ Moutou 2h
Juin.13-16 L091N11/N08/N12 Donati 3.5h/ Garcia 1h/ Moutou 2h
Juin.17-19 L081N11/09 Donati 3.5h/Petit
Juin.20-21 Pompage cryostat
Juin.22-30 L081N11/09 Donati 3.5h/Petit
Juil.1-05 L081N09 Petit
Juil.06-14 L091N06 Catala
Juil.15-19 Tech. Pompage cryostat
Juil.20-31 L081N13 Bouret
Août.1-7 L081N13/N08 Bouret/Moutou 1h
Août.8-22 L081N14/N08 Morin/Moutou 1h
Août.23-31 Tech. Groupe froid

 

CALENDRIER : 2009 A

 Date Nom PI/Mission Titre
Sept.01 – 05 Fermé
Sept.06 – 10 Pompage CRYO
Sept.11 – 12 Lebre L0882N01 Etude spectropolarimétrique des MIRAS
Sept.13 – 19 Konstantinova L081N02 Magnetic Fields in Late-type Giant Stars
Sept.20 – 30 Konstantinova N02/Moutou N03 Magnetic Fields in Late-type Giant Stars/Interactions étoile-planète : observations coordonnées CoRoT-NARVAL du système HD 46375
Oct.01 – 04 Pompage Cryo
Oct.05 – 11 Moutou N03/Soubiran L082N04 Interactions étoile-planète : observations coordonnées CoRoT-NARVAL du système HD 46375/Ground-based observations for Gaia calibrations : reference stars for radial velocities and astrophysical parameters
Oct.12 Moutou N03/Lebre L082N01 Interactions étoile-planète : observations coordonnées CoRoT-NARVAL du système HD 46375/
Oct.13 Konstantinova N02/Moutou N03 Magnetic Fields in Late-type Giant Stars/Interactions étoile-planète : observations coordonnées CoRoT-NARVAL du système HD 46375
Oct. 14 – Nov. 02 Moutou N03/Bouret L082N05 Interactions étoile-planète : observations coordonnées CoRoT-NARVAL du système HD 46375/Field geometry and wind confinment of magnetic O stars
Nov. 03 – Dec 02 Technique/Cryostat
Déc. 03 Moutou N03/Catala L082N06 Interactions étoile-planète : observations coordonnées CoRoT-NARVAL du système HD 46375/Follow-up of the seismology programme of the COROT space mission
Dec. 04 – 19 Donati N07/Moutou N03/Catala N06 MaPP – studying the impact of magnetic fields on the formation of lowmass stars and planets/Interactions étoile-planète : observations coordonnées CoRoT-NARVAL du système HD 46375/Follow-up of the seismology programme of the COROT space mission
Déc. 20 – 21 Catala N06/Konstantinova N02 Follow-up of the seismology programme of the COROT space mission/Magnetic Fields in Late-type Giant Stars
Dec.22 – Janv.01 Cryo Check
Janv.02 – 07 Bouvier L082N08/Catala N06 Spot evolution on the weak-line T Tauri star V410 Tau/Follow-up of the seismology programme of the COROT space mission
Janv.08 – 19 Bouvier N08/SilvesterN09/Catala N06 Spot evolution on the weak-line T Tauri star V410 Tau/Magnetic Doppler Imaging of Ap Stars/Follow-up of the seismology programme of the COROT space mission
Janv.20 – 22 Test service/Pompage
Janv.23 – Fev. 14 Petit L082N10 Dynamo processes and magnetic cycles in solar-type stars
Fev. 15 Lebre L082N01 Etude spectropolarimétrique des MIRAS
Fev.16 – 19 Pompage
Fev.20 – 24 Alecian L082N11 Magnetic properties of intermediate-mass pre-main sequence stars
Fev.25 – 28 Tests Service

 

CALENDRIER : 2008 B

  Date    Mission Nom PI Titre
Mars.01-19 Tech. Aluminisation Primaire
Mars.20-23 Tech. Pompage cryostat.
Mars.24- Avr.09 L081N01 / L081N02 Konstantinova-Antova / Alecian Magnetic Fields in Late-type Giant Stars / Magnetic properties of intermediate-mass pre-main sequence stars
Avr.10-13 Tech. Pompage cryostat.
Avr.14-16 L081N01 / L081N02 Konstantinova-Antova / Alecian Magnetic Fields in Late-type Giant Stars / Magnetic properties of intermediate-mass pre-main sequence stars
Avr.17 L081N03 Lebre Etude spectropolarimétrique des étoiles variables pulsantes
Avr.18-25 L081N04 Silvester Magnetic Doppler Imaging of Ap stars
Avr.26-27 Fermé
Avr.28- Mai.1 Tech. Centrale froid
Mai.2-4 Fermé
Mai.5- 9 Tech. Centrale hydr. / électronique
Mai.10-11 Fermé
Mai.12-15 Tech. Centrale cryo. / Coupole / Pompage
Mai.16-18 Fermé
Mai.19-23 L081N05 Berdyugina Magnetic topology on cool active stars
Mai.24-25 L081N05 / L081N06 Berdyugina / Lilensten Magnetic topology on cool active stars / Venusian red and green oxygen atmospheric glows and study of a possible polarisation with Narval
Mai.26-02 juin / L081N07 Jeffers Temporal evolution of differential rotation and magnetic field topology on the G0V dwarf HD171488
Juin.3 L081N03 Lebre Etude spectropolarimétrique des étoiles variables pulsantes
Juin.4 L081N10 soubiran Ground-Based Observations for Gaia calibrations : reference stars for radial velocities
Juin.5-8 Tech. Pompage cryostat.
Juin.9-20 L081N08 Neiner Champs magnétiques dans les étoiles B
Juin.21-30 L081N09 Bouret Hunting magnetic fields in OB Stars
Juil 01-02 L081N10 Soubiran Ground-Based Observations for Gaia calibrations : reference stars for radial velocities
Juil.03-06 Tech. Pompage cryostat.
Juil.07-09 L081N10 Soubiran Ground-Based Observations for Gaia calibrations : reference stars for radial velocities
Juil.10-19 L081N11 / L081N12 Moutou / Catala Interaction étoile-planète : suivi des systèmes HD189733 et Tau Bootis / Follow-up of the seismology programme of the COROT space mission
Juil.20-24 L081N12 Catala Follow-up of the seismology programme of the COROT space mission
Juil.25-29 L081N13 Boehm Is Vega a pulsating star ?
Juil.30-Août.8 Fermé
Août.9 Tech. démarrage
Août.10-31 L081N14 Catala/Petit Dynamo processes and magnetic cycles in solar-type stars

 

CALENDRIER : 2008 A

Date Mission Nom PI Titre
Sept. 01-02 Tech. Pompage cryostat
Sept. 03 L072T01 Technique
Sept. 04-05 L072N01 Lèbre Etude spectropolarimétrique des étoiles variables pulsantes
Sept. 06-013 L072N02/L072N03 Henrichs/Soubiran Magnetic Studies of Xi Persei/Ground-based observations for gaia calibrations
Sept. 14-15 L072N03 Soubiran Ground-based bservations fao Gaia calibrations
Sept. 16-19 Tech. Pompage cryostat
Sept. 20-26 L072N04/L072T02 Auriére/DDT Weak Magnetic fields at the surface of MS A and late B stars/TBD
Sept. 27- Oct. 10 Fermé
Oct. 11-14 Tech. Pompage cryostat.
Oct. 15-24 L07N05 Bourret Magnetic fields in OB stars : detection, geom and wind confinement téléphérique fermé
Oct. 25-28 L072T03 T.B.L Préparaton delta, electronique téléphérique fermé
Oct. 29- Nov. 02 L072N06 Lemasle Is the galactic abundance gradient « multimodal » ?
Nov. 03-04 Tech. Pompage cryostat.
Nov. 05-14 L072N07 Alecian Magnetic Properties of intermediate-masse pre-MS stars téléphérique fermé
Nov.15-28 L072N08 Neiner Champs magnétique dans les étoiles B (suite) téléphérique fermé
Nov.29-Dec. 02 Tech. Pompage cryostat.
Déc. 03-18 L072N09 Catala Follow-up of the seismology prog of COROT space mission téléphérique fermé
Déc. 19-24 Fermé/Pompage
Déc. 27-Janv.02 L072N10/L072N11 Marsden/Donati Do F stars have a different dynamo to lower mass stars ? Magnetic fields of protostellar accretion discs and mass-accreting protostars
Janv. 03-08 L072N12/L072N11 Silvester/Donati Magnetic doppler imaging of Ap stars Magnetic fields of protostellar accretion discs and mass-accreting protostars
Janv. 09-13 L072N12 Silvester Magnetic doppler imaging of Ap stars
Janv. 14-16 Tech. Pompage cryostat.
Janv. 17- Fev. 06 L072N13 Petit Dynamo processes and magnetic cycles in solar-type stars
Fév. 07-08 Tech. Pompage cryostat
Fév.09-12 L072N13 Petit Dynamo processes and magnetic cycles in solar-type stars
Fév. 13-16 L072N01/L072N13 Lébre/Petit Etude spectropolarimetrique des étoiles variables pulsantes/Dynamo processes and magnetic cycles in solar-type stars
Fév. 17-28 L072T04 T.B.L. Remplacement Delta

 

CALENDRIER : 2007 B

Dates Mission Nom PI
Mars 5-7 Tech. Pompage cryostat.
Mars 8 L071N01 Aurière/Domiciano
Mars 9-15 L071N02 Aurière
Mars 16-30 L071N03 Alecian
Avril 1-20 Tech. CCD/rhomb.
Avril 21-22 Tech. Pompage cryostat
Avr. 23-Mai 7 L071N04 Sylvester
Mai 8-13 fermé
Mai 14-20 Tech. Pompage cryostat
Mai 21-29 L071N05 Jeffers/Cabanac
Mai 30-31 Tech. Pompage cryostat
Juin 1-20 L071N06 Catala
Juin 21-22 Tech. Pompage cryostat
Juin 23- Juil. 12 L071N07 Neiner
Juil. 13-22 fermé
Juil. 23-24 Tech. Pompage cryostat
Juil. 25-Août 29 L071N08 Petit
Août 30 L071N09 Petit/Domiciano

 

 CALENDRIER : 2007 A

Dates Mission Nom PI
Mars 5-7 Tech. Pompage cryostat.
Mars 8 L071N01 Aurière/Domiciano
Mars 9-15 L071N02 Aurière
Mars 16-30 L071N03 Alecian
Avril 1-20 Tech. CCD/rhomb.
Avril 21-22 Tech. Pompage cryostat
Avr. 23-Mai 7 L071N04 Sylvester
Mai 8-13 fermé
Mai 14-20 Tech. Pompage cryostat
Mai 21-29 L071N05 Jeffers/Cabanac
Mai 30-31 Tech. Pompage cryostat
Juin 1-20 L071N06 Catala
Juin 21-22 Tech. Pompage cryostat
Juin 23- Juil. 12 L071N07 Neiner
Juil. 13-22 fermé
Juil. 23-24 Tech. Pompage cryostat
Juil. 25-Août 29 L071N08 Petit
Août 30 L071N09 Petit/Domiciano

 

 

CALENDRIER 2007 B

 

Date Mission Nom PI Titre
Sept. 01-02 Tech. Pompage cryostat
Sept. 03 L072T01 Technique
Sept. 04-05 L072N01 Lèbre Etude spectropolarimétrique des étoiles variables pulsantes
Sept. 06-013 L072N02/L072N03 Henrichs/Soubiran Magnetic Studies of Xi Persei/Ground-based observations for gaia calibrations
Sept. 14-15 L072N03 Soubiran Ground-based bservations fao Gaia calibrations
Sept. 16-19 Tech. Pompage cryostat
Sept. 20-26 L072N04/L072T02 Auriére/DDT Weak Magnetic fields at the surface of MS A and late B stars/TBD
Sept. 27- Oct. 10 Fermé
Oct. 11-14 Tech. Pompage cryostat.
Oct. 15-24 L07N05 Bourret Magnetic fields in OB stars : detection, geom and wind confinement téléphérique fermé
Oct. 25-28 L072T03 T.B.L Préparaton delta, electronique téléphérique fermé
Oct. 29- Nov. 02 L072N06 Lemasle Is the galactic abundance gradient « multimodal » ?
Nov. 03-04 Tech. Pompage cryostat.
Nov. 05-14 L072N07 Alecian Magnetic Properties of intermediate-masse pre-MS stars téléphérique fermé
Nov.15-28 L072N08 Neiner Champs magnétique dans les étoiles B (suite) téléphérique fermé
Nov.29-Dec. 02 Tech. Pompage cryostat.
Déc. 03-18 L072N09 Catala Follow-up of the seismology prog of COROT space mission téléphérique fermé
Déc. 19-24 Fermé/Pompage
Déc. 27-Janv.02 L072N10/L072N11 Marsden/Donati Do F stars have a different dynamo to lower mass stars ? Magnetic fields of protostellar accretion discs and mass-accreting protostars
Janv. 03-08 L072N12/L072N11 Silvester/Donati Magnetic doppler imaging of Ap stars Magnetic fields of protostellar accretion discs and mass-accreting protostars
Janv. 09-13 L072N12 Silvester Magnetic doppler imaging of Ap stars
Janv. 14-16 Tech. Pompage cryostat.
Janv. 17- Fev. 06 L072N13 Petit Dynamo processes and magnetic cycles in solar-type stars
Fév. 07-08 Tech. Pompage cryostat
Fév.09-12 L072N13 Petit Dynamo processes and magnetic cycles in solar-type stars
Fév. 13-16 L072N01/L072N13 Lébre/Petit Etude spectropolarimetrique des étoiles variables pulsantes/Dynamo processes and magnetic cycles in solar-type stars
Fév. 17-28 L072T04 T.B.L. Remplacement Delta

 

What do you want to do ?

New mail

What do you want to do ?

New mail

What do you want to do ?

New mail

Rechercher